CONSTRUCTION DIARY: FIRE PROTECTION SYSTEM RENOVATION – SAFETY AS THE FOUNDATION OF PROSPERITY

1. Project Introduction

As fire safety standards become increasingly stringent, maintaining and renovating fire water supply systems is not only a legal responsibility but also a shield protecting assets and lives. Today, April 24, 2026, our engineering team continues to deploy key items at the project for... Co., Ltd.

2. General Information

Category: Renovation of Fire Protection Water Supply Pipelines (Outdoor loop and indoor workshop).

Supervisor: Mr. Pham Quoc Duy – An expert with over 10 years of experience in MEP project coordination.

Objective: To comprehensively upgrade water flow capacity and the durability of the support system.

3. Work Details (April 24, 2026)

3.1. Fabrication of Support Systems and Outdoor Loop Pipes

Outdoor areas require equipment that can withstand environmental and weather impacts. Today, the team completed:

Cutting, threading, and welding joints for the loop pipeline.

Fabricating heavy-duty support systems using galvanized steel to prevent corrosion.

Welding quality control using manual inspection and specialized measuring tools.

3.2. Installation of Supports along the Indoor Workshop Pipeline

Inside the production area, the most crucial factors are precision and ensuring no disruption to the customer's production lines.

Utilizing aerial man-lifts (scissor lifts) to safely access high-altitude positions.

Installing pipe hangers and supports according to the design drawings, ensuring standard spacing to prevent vibration during sudden water pressure surges.

4. Execution Capability: Human Resources & Equipment

To ensure "Grade A" quality, we focus on two key elements:

Personnel: 01 Supervisor, 01 Team Leader, and 03 skilled workers. The seamless coordination between management and technicians optimizes construction time.

Technology & Equipment: We utilize the latest cordless drills and modern welding machines to minimize noise and dust within the workshop. The use of specialized lifts ensures absolute safety for personnel working at heights.

5. Timeline Commitment

Based on the current workload, the project is strictly following the proposed roadmap. The entire system is expected to be inspected and handed over by June 26, 2026.

Xem thêm
  • Chia sẻ qua viber bài: Grade A Fire Protection System Renovation - Project Construction Diary: April 24, 2026
  • Chia sẻ qua reddit bài:Grade A Fire Protection System Renovation - Project Construction Diary: April 24, 2026

News

Loading...

Service Catalog

Loading...

Thư viện ảnh

Loading...

Related Services

Loading...
Loading...
CHUAN A CONSTRUCTION INVESTMENT JOINT STOCK COMPANY